-
Load and unload facilities
HOME > Field of Business > Load and unload facilities
- :: Production and Repair
CONTINUOUS SHIP UNLOADER(CSU)
Capacity : maximum 1,500ton per 1hour
Specially, optimization for large-bulk carrier
Possible to unload the materials such as coal, cement, grain, bean, seed and etc rapidly and
economically
-
GRAP TYPE SHIP UNLOADER(GTSU)
Using : Raising after grasping the material such as wood, scrap iron, oxide(sticking to Crane) Commonly, being run by oil pressure, electricity, self-weight
-
BRIDGE TYPE(TRAVELING) CRANE
Install long bridge and equip the crane on the long bridge Commonly, the type to adhere the magnet.
Adhere hook, bucket, lifting beem according to needs.
Mainly being used to unload the products of POSCO in Pohang and kwangyang port.
-
RMQC (Rail Mounted Quayside Crane)
RMQC means the crane to be designed specially for loading and unloading of containers. It runs parallel with ships on apron after installation it in the pier.
In case the beam overhang on the ship for running, the trolley is rampant according to the beam. And the hook of the spreader which is located in understructure pick and put the containers through oil pressure. This is how to load and unload the containers.
RMQC can handle bigger freight than containers. In case of this, the spreader have to be replaced by lifting beam.
It's assorted to conventional type, 4TH generation type according to sizes And also to modified A frame type, articulated type, low profile type according to the shape of the crane.
-
SHIP LOADER
Equipment to be used to be antithetical with ship unloader.
It loads the bulks like coal, ore, grain and etc through belt conveyer on ships
-
STACKER and RECLAIMER
IT piles up the oxide to be transferred from the port in designated area through belt conveyer. And it transfer and carry out piled oxide after digging by bucket.
It can assort as each special equipment or It also means the equipment as one.
- :: Construction record
Construction name : CSU disassemble, transportation, change, assemble, painting, start-up test
Period : 2012.03 ~ 2014.03
-
Disassemble and transportation construction
Repair and change construction
Painting and assemble construction